Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
SCPC7018
 
Posts: n/a
Default How do I change the order of choices in menu File- Send To

I continually take the first option and end up with a worksheet in the body
of the mail message instead of as an attachment! If I can change the order of
options I would hopefully overcome this. How do you get rid of mail headers
etc when you make this mistake??
  #2   Report Post  
David McRitchie
 
Posts: n/a
Default

First thing I would do is turn off the smart menu option that put your most recent
stuff first then after a delay give you the full menu
Right click on toolbar (same as tools, customize), then folder menu, then
turn off "Menus show recently used commands first"

Then if that is not sufficient you can change the menu order like you asked
also within customize as above (right click on menus or toolbars)
select a menu, with the right mouse button drag a menu item to where
you want it. If you drag if off the menu -- it is removed. If you removed
a builtin menu item you can find it again on the commands tab of
customize and drag from there back to menu or toolbar where you want it.

Your toolbar is a hidden file so before doing anything I would suggest that
you not have hidden system files. By finding it ahead of time you will
know where it is because if you really mess up and you have not closed
Excel you simply open your .xlb file and your toolbars go back to wheat
they were saved as in your last Excel session.

More information on toolbars and menus in
http://www.mvps.org/dmcritchie/excel/toolbars.htm

rather than messing with the order in the standard menus you might
want to make up your menu and drag from the customize profile

---
HTH,
David McRitchie, Microsoft MVP - Excel [site changed Nov. 2001]
My Excel Pages: http://www.mvps.org/dmcritchie/excel/excel.htm
Search Page: http://www.mvps.org/dmcritchie/excel/search.htm

"SCPC7018" wrote in message ...
I continually take the first option and end up with a worksheet in the body
of the mail message instead of as an attachment! If I can change the order of
options I would hopefully overcome this. How do you get rid of mail headers
etc when you make this mistake??



  #3   Report Post  
SCPC7018
 
Posts: n/a
Default

Thank You! Very much appreciated.

"David McRitchie" wrote:

First thing I would do is turn off the smart menu option that put your most recent
stuff first then after a delay give you the full menu
Right click on toolbar (same as tools, customize), then folder menu, then
turn off "Menus show recently used commands first"

Then if that is not sufficient you can change the menu order like you asked
also within customize as above (right click on menus or toolbars)
select a menu, with the right mouse button drag a menu item to where
you want it. If you drag if off the menu -- it is removed. If you removed
a builtin menu item you can find it again on the commands tab of
customize and drag from there back to menu or toolbar where you want it.

Your toolbar is a hidden file so before doing anything I would suggest that
you not have hidden system files. By finding it ahead of time you will
know where it is because if you really mess up and you have not closed
Excel you simply open your .xlb file and your toolbars go back to wheat
they were saved as in your last Excel session.

More information on toolbars and menus in
http://www.mvps.org/dmcritchie/excel/toolbars.htm

rather than messing with the order in the standard menus you might
want to make up your menu and drag from the customize profile

---
HTH,
David McRitchie, Microsoft MVP - Excel [site changed Nov. 2001]
My Excel Pages: http://www.mvps.org/dmcritchie/excel/excel.htm
Search Page: http://www.mvps.org/dmcritchie/excel/search.htm

"SCPC7018" wrote in message ...
I continually take the first option and end up with a worksheet in the body
of the mail message instead of as an attachment! If I can change the order of
options I would hopefully overcome this. How do you get rid of mail headers
etc when you make this mistake??




Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
in a excel file, how to make a menu item for the .xls file that when clicked on it runs myform.show? example plz Daniel Excel Worksheet Functions 1 July 7th 05 03:52 AM
how do i change order of columns in a list published to sharepoint p_wills Excel Discussion (Misc queries) 0 May 19th 05 08:30 AM
Read Text File into Excel Using VBA Willie T Excel Discussion (Misc queries) 13 January 8th 05 12:37 AM
canot remove command from FILE MENU EXCEL CUstomization Excel Discussion (Misc queries) 2 December 7th 04 01:10 AM
How do I Delete a file from the drop down file menu? Sander Excel Worksheet Functions 2 November 6th 04 05:05 PM


All times are GMT +1. The time now is 02:18 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"