LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.worksheet.functions
CM CM is offline
external usenet poster
 
Posts: 136
Default formula for days between completed meetings

Here's the deal. I have 10 meeting dates (some may be blank) and 10 columns
beside each that are either blank (meaning completed) or have the word
'Missed', as such:

A B C D E
1/2/09 (blank) 1/4/09 Missed 1/5/09 (blank) etc etc

Too many to use nested IFs.

I have been asked to calculate the average days between non-missed meetings.
Some of the meeting date cells will be blank. I would appreciate any advice.

--
cm
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Formula for 20 minute meetings Excel ??[_2_] Excel Discussion (Misc queries) 4 July 2nd 09 12:44 AM
Data in columns. Which formula will identify last completed colu. Piet Excel Worksheet Functions 2 June 15th 09 09:35 AM
Past Due/Completed on time date formula Stacy Excel Discussion (Misc queries) 3 June 13th 08 06:16 PM
How do I export dates and locations of meetings to outlook calend David P Excel Discussion (Misc queries) 1 May 15th 07 05:17 PM
Report Date - Date Recv = Days Late, but how to rid completed date MS Questionnairess Excel Worksheet Functions 1 January 24th 07 11:05 PM


All times are GMT +1. The time now is 10:30 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"