Question on formula of matching Project Workload vs Resource Capac
Hello.
I'd like to ask for some ideas on how to do the following. I'm trying to build a report that will match multiple projects and required "workload days needed" against multiple "workload available" resources. A simple layout of the Excel would be in 2 blocks of data. 1st is: Project, Project Ranking (what should be done first), resource assigned, project days needed and Can it be done? determination. Project Ranking Resource Project Days Needed Can Be Done? A 1 Manuel 10 Yes B 2 Cindi 10 Yes C 3 Cindi 10 Yes D 4 Cindi 10 Yes E 5 Cindi 10 Yes F 6 Maynard 10 Yes G 7 Maynard 10 Yes H 8 Maynard 10 No I 9 Cindi 10 No The second table matches Project Days needed against available resources. Resource Project Days Available Project Days Needed Delta Manuel 20 10 10 Cindi 40 50 -10 Maynard 20 30 -10 I can get the days needed from the sumif function. My questions: 1) What would be the formula to write for the "Can Be Done?" column in the first block of data? I have a concept of tracking the cumulative days needed by person to compare against days available... but I'm stuck on the formula. 2) Would the resulting formula recommended be robust enough if I had to resort the rankings? 3) Can this be done in a pivot table? Thanks to this great community for all its help! -- Thanks, Morocco Mole |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
VBA Project question????????????????? | Excel Discussion (Misc queries) | |||
data linking/field matching/formula updating long question | Excel Discussion (Misc queries) | |||
random assignments of workload to set # of people | Excel Worksheet Functions | |||
When Excel Just Can't Hadle the Workload | Excel Discussion (Misc queries) | |||
Allocate workload evenly to different staff | Excel Worksheet Functions |