I am trying to calucate cycle times. I have 2 milestones (each with a
planned and actual date Column A: Milestone 1 Planned Column B: Milestone 1 Actual Column C: Milestone 2 Planned Column D: Milestone 2 Actual If the period between the two periods has occured (Actual), then we want to subtract D from B to determine the cycle time. If they are blank then the cycle time is planned and the cycle time must be calculated by Column C- Column B (if it occured) or Column C - Column A. It would be great to distinguish the cycle and whether or not it is planned or actual in one field. ALternatively, we can have a separate column for planned (which would be blank if there was an actual) or actual column. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
cycle time | Charts and Charting in Excel | |||
More Planned and Actual Cycle Times | Excel Worksheet Functions | |||
Time Cycle | Excel Discussion (Misc queries) | |||
2 cycle logarithmic? | Charts and Charting in Excel | |||
How do I keep result from 1 iteration cycle to use in next cycle? | Excel Discussion (Misc queries) |