LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.worksheet.functions
external usenet poster
 
Posts: 251
Default Difficult formula

I have this formula that is working great, but I need to expand on it and I
have no idea how:
=IF(H123="","",IF(H123="Not Scheduled","TBA",WORKDAY(H123,IF(J123="LOW
SLIP",3,1),NWD)))
The "NWD" at the end of the formula is a named range of dates (non-workdays).
What I would like to add to this formula is to do with the last part
(H123,IF(J123 ="LOW SLIP", etc.). This is what I need to incorporate in
that: if the 3 days added to the date in H123 includes a weekend, then it
would only add 1 day. But this would only be if J123 has "LOW SLIP" in it,
otherwise it would add the 3 days.
I hope someone can come to my aid because I am tired of updating this
manually.
Thank you. Connie
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Difficult formula question JRD-CFW Excel Worksheet Functions 7 October 3rd 08 10:22 PM
Difficult Formula tommcbrny Excel Worksheet Functions 9 August 12th 08 02:10 PM
Difficult Formula Mike Excel Worksheet Functions 2 November 21st 06 11:21 PM
Difficult Formula Cindy Excel Worksheet Functions 2 March 9th 06 10:26 PM
Difficult look up formula Alex Excel Worksheet Functions 4 June 24th 05 09:28 PM


All times are GMT +1. The time now is 01:32 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"