LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.worksheet.functions
external usenet poster
 
Posts: 15
Default Hope to change order of vertical cells when pasting

Hi,
I have two questions..

I have daily records for electricity prices.. I am compiling from
several years, but right now they are divided by year with the last
day of the year (12/31/yy) at the top. I want to copy and paste it so
that the first day of the year (1/1/yy) is at the top and it ends with
12/31/yy...

Also, it is currently pasting without the grid lines of the cells..
When I go to paste special there are options to "paste" or "paste
link" and may suboptions for each. What should I choose so that it
pastes with each value in an individual cell showing the grid lines.

Thank you!
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
copy cells down a column (in order) to across a row (same order?? Tampa9 Excel Discussion (Misc queries) 1 December 4th 08 04:23 PM
How do I change horizontal cells to vertical JMP Excel Discussion (Misc queries) 1 August 7th 08 09:40 PM
Cutting and Pasting cells from horizontal to multi vertical column Ms SDB Excel Worksheet Functions 4 January 22nd 07 09:20 PM
how do I change the size of vertical scroll bar Peg B Excel Discussion (Misc queries) 6 July 29th 06 02:48 PM
Pasting on Filtered Data Sheets without pasting onto hidden cells CCSMCA Excel Discussion (Misc queries) 1 August 28th 05 01:22 PM


All times are GMT +1. The time now is 07:20 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"