LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Al H.
 
Posts: n/a
Default Networkdays Function Not Working

I have been successfully using this function for quite some time. My formula
is (=if(t30,networkdays(r3,u3)," ") where t3 is a date also. Before you
ask, yes, I have the analysis tool pack add-in. The only difference is I
have switched over to the new XP operating system. Any ideas?
--
Al H.
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Need a ISWorkday Function -- Any Ideas Mark Excel Worksheet Functions 5 March 29th 05 01:58 AM
How do I install the networkdays function! DaZ..ign Excel Worksheet Functions 2 February 16th 05 03:03 PM
Calculating days between current date and a date in future NETWORKDAYS() function Faheem Khan Excel Worksheet Functions 2 February 10th 05 07:18 PM
Function in xl2003 not working in xl97 Adam Excel Discussion (Misc queries) 2 January 26th 05 03:19 PM
MS Excel Function - Networkdays Nilesh Inamdar Excel Worksheet Functions 3 November 26th 04 07:10 PM


All times are GMT +1. The time now is 08:24 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"