LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.worksheet.functions
external usenet poster
 
Posts: 2
Default Need help with a forcasting type problem

I am trying to have excel do a few automatic calculations for me. In the
problem I am trying to solve I have the following:

Given:
Month (day 1-31)
production each day (ranges from 0-3000 value is linked from another file)
life of a tool (consider 10,000 before it needs changed)

Find:
Have a cell change color using (format cell) when tool life is up.

I have been able to do this for an entire month worth of projected
production (dividing it evenly into the number of production days) but have
not been able to use a forcast funtion. I really do not care what funtion I
use to do this just that I can expand this into a larger project with
multiple tools (say 75) each with the posibility of differnt life
expectancies. Thanks for any help someone can offer.

--
Brake-Man2008
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Chart type problem xavi garriga Charts and Charting in Excel 1 July 2nd 08 01:58 PM
Forcasting for a multiyear period nelsok Excel Discussion (Misc queries) 3 January 20th 06 07:22 PM
how do I multiply dollars by networkdays for forcasting run rates George Cahill Excel Worksheet Functions 6 January 17th 06 01:45 PM
Data Type Problem? bailey Excel Discussion (Misc queries) 8 December 6th 05 03:51 AM
Custom Type Charts Problem Reetesh B. Chhatpar Excel Worksheet Functions 0 November 23rd 04 10:55 AM


All times are GMT +1. The time now is 12:57 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"