This seems so impossible that I need to post it here with a request for
someone please to tell me why I'm wrong....

Excel 2003 can determine the number of days between two dates based on
a year of twelve months each having thirty days. And Excel 2003 can
determine the number of workdays between two dates. But, even with all
Microsoft optional analysis "tool-paks" installed, it appears that
Excel 2003 cannot calculate the number of days--not limited to work
days--between two dates based on an actual year, i.e., the number of
days in the actually involved months and year(s).

What I'm looking for is the functionality of Lotus 1-2-3's DAYS
function with a base of 1 (there are several optional bases for 1-2-3's
@DAYS, depending on the calendar assumptions you want to operate, and
"1" is actual number of days in the month/actual number of days in the
year).

Am I missing something??

  #2   Report Post  
Posted to microsoft.public.excel.worksheet.functions
external usenet poster
 
Posts: 5
Default Days between

I don't know if it matters, but the 1-2-3 version discussed above is
the current 9.8.4

  #3   Report Post  
Posted to microsoft.public.excel.worksheet.functions
external usenet poster
 
Posts: 620
Default Days between

I don't know what the Lotus 123 functionality is, but if you want to count
the number of days from one date to another, what's wrong with =A1-A2? With
a date of 6/1/07 in A1 and 6/1/06 in A2, that formula will give 365
(providing that you format the result as General, or number, rather than
date).
--
David Biddulph

"Joseph N." wrote in message
ups.com...
This seems so impossible that I need to post it here with a request for
someone please to tell me why I'm wrong....

Excel 2003 can determine the number of days between two dates based on
a year of twelve months each having thirty days. And Excel 2003 can
determine the number of workdays between two dates. But, even with all
Microsoft optional analysis "tool-paks" installed, it appears that
Excel 2003 cannot calculate the number of days--not limited to work
days--between two dates based on an actual year, i.e., the number of
days in the actually involved months and year(s).

What I'm looking for is the functionality of Lotus 1-2-3's DAYS
function with a base of 1 (there are several optional bases for 1-2-3's
@DAYS, depending on the calendar assumptions you want to operate, and
"1" is actual number of days in the month/actual number of days in the
year).

Am I missing something??



  #4   Report Post  
Posted to microsoft.public.excel.worksheet.functions
external usenet poster
 
Posts: 5,651
Default Days between

On 6 Jan 2007 12:55:06 -0800, "Joseph N." wrote:

This seems so impossible that I need to post it here with a request for
someone please to tell me why I'm wrong....

Excel 2003 can determine the number of days between two dates based on
a year of twelve months each having thirty days. And Excel 2003 can
determine the number of workdays between two dates. But, even with all
Microsoft optional analysis "tool-paks" installed, it appears that
Excel 2003 cannot calculate the number of days--not limited to work
days--between two dates based on an actual year, i.e., the number of
days in the actually involved months and year(s).

What I'm looking for is the functionality of Lotus 1-2-3's DAYS
function with a base of 1 (there are several optional bases for 1-2-3's
@DAYS, depending on the calendar assumptions you want to operate, and
"1" is actual number of days in the month/actual number of days in the
year).

Am I missing something??


To count the number of days between two dates based on an actual year:

=Date2 - Date1

Format as General.

Or with your dates in A1 and A2:

=A2-A1

Excel stores dates as the number of days since 1/1/1900 so to determine the
difference between two dates it is merely a matter of subtracting one from the
other.

The Lotus 1-2-3 error of designating 1900 as a leap year was replicated in
Excel "for compatibility". So the formula will not give accurate results for
that time frame (early 1900). Otherwise, it works fine.


--ron
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
CAn any one solve this problem of days months and years.its urgent plzzzzzzzzzzzz naughtyboy Excel Discussion (Misc queries) 3 August 19th 06 05:45 PM
No. of days split into periods Brian Ferris Excel Discussion (Misc queries) 3 January 31st 06 03:29 PM
Calendar Days and Option Buttons Andy Excel Discussion (Misc queries) 0 January 10th 06 09:50 PM
30, 60, 90 days late and due within 14 days armyaviatr Excel Discussion (Misc queries) 1 November 7th 05 09:14 AM
Working days left in the month compared to previous months qwopzxnm Excel Worksheet Functions 8 October 24th 05 08:00 PM


All times are GMT +1. The time now is 09:42 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"