Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Posted to microsoft.public.excel.worksheet.functions
external usenet poster
 
Posts: 1
Default How do I build a Construction Schedule of Values in Excel?

I need to create a simple Excel Spreadsheet that can be used as a
Construction Schedule of Values. Then in the same Excel document I need to
have the data from the schedule of values transfer over to a standard
Construction Invoice.
  #2   Report Post  
Posted to microsoft.public.excel.worksheet.functions
external usenet poster
 
Posts: 694
Default How do I build a Construction Schedule of Values in Excel?

Caleb:

1. Make an entry form with the columns for the information for entry
2. Link the data on to the invoice. This may be with VBA macros of links to
the original form
3. Develop a mechanium for recording invoice numbers etc.
4. Test it and get user acceptance.

Have fun with your little project.


--
Hope this helps
Martin Fishlock
Please do not forget to rate this reply.


"Caleb Howze" wrote:

I need to create a simple Excel Spreadsheet that can be used as a
Construction Schedule of Values. Then in the same Excel document I need to
have the data from the schedule of values transfer over to a standard
Construction Invoice.

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
CSV export from Excel always recognise null values in the last col RichardOKeefe Excel Discussion (Misc queries) 2 April 28th 06 06:56 AM
excel storing previous cell values in memory Brent Bortnick Excel Worksheet Functions 2 April 19th 06 09:00 PM
EXCEL - need help with IF for dates on schedule Spear Excel Worksheet Functions 1 October 3rd 05 05:07 PM
How do I sum rounded values from two seperate formulas in Excel? Federali Excel Worksheet Functions 1 May 3rd 05 06:01 PM
Missing values in Excel Line Chart mw55309 Charts and Charting in Excel 1 January 19th 05 12:10 PM


All times are GMT +1. The time now is 08:48 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"