Home |
Search |
Today's Posts |
#1
Posted to microsoft.public.excel,microsoft.public.excel.worksheet.functions
|
|||
|
|||
WEEKNUM() Question
The results of WEEKNUM() don't correspond with the calendaring system I
want. My first question is simple: How does the WEEKNUM() algorithm work? If I can figure out what it's based on, I can probably match it to the calendar I'm using. It looks like it's anywhere from 1 day off to 2 days off from my calendar, depending on when my week decides to start. The calendar I have starts on Mondays and assigns WEEK-1 to the first week of January with at least 4 days in it. So if WEEKDAY(DATE(YEAR,1,1),2) is 5 (Friday) or greater, then the week doesn't start until WEEKDAY() yields 1. This means that up to first 4 days of January would be considered WK 52 (or 53). I started to wonder if there was a better way to do it, when my formula started approaching 150 characters, and I still hadn't accounted for the WK 53 case or leap year. I've never built my own function, but something tells me it would be the cleanest way to do it. I have a pdf of about 15 years worth, if anyone is interested in taking a look. Since it's .5MB, I won't try to attach it. <http://www.capeyork.us/data/Calendar.pdf. Thanks in advance to the first "smart-guy" to help me out. I've been hoping to make time to figure this out for quite a while now. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Possibly a loaded question, but I think | Excel Discussion (Misc queries) | |||
How do I find and replace a question mark in Excel? | Excel Discussion (Misc queries) | |||
Newbie With A Question | Excel Worksheet Functions | |||
Anybody Help with previous question | Excel Discussion (Misc queries) | |||
Hints And Tips For New Posters In The Excel Newsgroups | Excel Worksheet Functions |