Hi all

I have a worksheet that is successfully taking a start and end time and
showing the hours worked (with hours worked formatted [h]:mm:ss). It then
uses a SumIf to separate the time spent on different tasks over several days
- currently using the same formatting and (for example) stored in cell H2 for
a particular task

I want to divide this total time for each task by 7.5 to equate to days and
show in cell I2, but (for example) 9:00:00 hours divided by 7.5 shows as 0.05
days rather than 1.2 days.

Do I need to use something other than H2/7.5 to divide? And/or is there a
particular formatting I should use to show the result correctly?

Many thanks
SueJB
  #2   Report Post  
Posted to microsoft.public.excel.worksheet.functions
external usenet poster
 
Posts: 2,574
Default Dividing hours to give days

Do this: =9:00:00/7.5*24

--
Brevity is the soul of wit.


"SueJB" wrote:

Hi all

I have a worksheet that is successfully taking a start and end time and
showing the hours worked (with hours worked formatted [h]:mm:ss). It then
uses a SumIf to separate the time spent on different tasks over several days
- currently using the same formatting and (for example) stored in cell H2 for
a particular task

I want to divide this total time for each task by 7.5 to equate to days and
show in cell I2, but (for example) 9:00:00 hours divided by 7.5 shows as 0.05
days rather than 1.2 days.

Do I need to use something other than H2/7.5 to divide? And/or is there a
particular formatting I should use to show the result correctly?

Many thanks
SueJB

  #3   Report Post  
Posted to microsoft.public.excel.worksheet.functions
external usenet poster
 
Posts: 38
Default Dividing hours to give days

Dave

It was so simple! Many thanks, much appreciated

Sue

"Dave F" wrote:

Do this: =9:00:00/7.5*24

--
Brevity is the soul of wit.


"SueJB" wrote:

Hi all

I have a worksheet that is successfully taking a start and end time and
showing the hours worked (with hours worked formatted [h]:mm:ss). It then
uses a SumIf to separate the time spent on different tasks over several days
- currently using the same formatting and (for example) stored in cell H2 for
a particular task

I want to divide this total time for each task by 7.5 to equate to days and
show in cell I2, but (for example) 9:00:00 hours divided by 7.5 shows as 0.05
days rather than 1.2 days.

Do I need to use something other than H2/7.5 to divide? And/or is there a
particular formatting I should use to show the result correctly?

Many thanks
SueJB

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
converting Days Hours & minutes into just minutes in excel Six Sigma Blackbelt Excel Discussion (Misc queries) 5 April 28th 06 09:45 PM
How to convert an elapsed time in minutes to Days hours and minute Time Tracker Excel Discussion (Misc queries) 1 April 9th 06 03:40 AM
need help with formula Bryan J Bloom Excel Discussion (Misc queries) 11 October 31st 05 10:52 PM
i need to convert seconds (ie: 17288.35111) into days, hours, min jriechers Excel Discussion (Misc queries) 1 September 27th 05 10:06 PM
Help! I am stuck calculating Days, Hours, Mins please help OB1 Excel Worksheet Functions 2 November 15th 04 05:17 PM


All times are GMT +1. The time now is 04:09 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"