LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Posted to microsoft.public.excel.programming
external usenet poster
 
Posts: 1
Default How to program with this problem

The problem is that:
Based on VBAfM, Chris Albright). The file Errors2.xls contains a time
series of
monthly sales in column A and a series of monthly forecasts in column
B. Write
a function called MAPE that finds the mean absolute percentage error
of the
forecasts. For example, the absolute percentage error in row 2 is |713
– 738|/713
= 0.035 or 3.5%. Write this function so that it works with any two
ranges of
observations and corresponding forecasts. Then try it out by entering
the
appropriate formula in cell E1.
There are 2 columns of number in Columns A and B. The excat number
does no matter.
Use the Function to output an column by pressing Ctrl+Shift+Enter.
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Problem with an estimating program [email protected] Excel Programming 1 May 13th 08 05:24 PM
The program have the same problem John21[_8_] Excel Programming 2 August 14th 06 02:10 PM
Problem with a program code highjumper[_6_] Excel Programming 3 August 25th 05 05:14 PM
vba program problem sarasa[_10_] Excel Programming 0 June 15th 04 01:37 AM
How to program to resolve the following problem. ..thx Artco News Excel Programming 2 October 1st 03 06:08 AM


All times are GMT +1. The time now is 03:00 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"