Home |
Search |
Today's Posts |
#1
Posted to microsoft.public.excel.programming
|
|||
|
|||
how to produce this 1-d table?
hi every one,
i want to produce a table that have these conditions, 1. the first row of the table should be the time intervals (I have already defined my time interval increment, eg: dt=0.25 year)and the first colume should start from time zero and the final time that I need to have calcuation is 1.5 year. so the first row look like this, time(year) 0 0.25 0.5 0.75 1 1.25 1.5 but the thing here is that i can drag the equation and it will be fine but I should just have the first and second colume values and be able to expand it self to 1.5 yr and after that stop,(depending on final time) 2.my second row should be my load increaments, but this also varies( in my spread sheet I have defined, no change in load with zero, constant change with one and abrupt change with 2. but I might have a constant change from 0 kpa to 40kpa from time interval of 0 to 0.5 yr, then at o.5 yr I have a abrupt change of load and the load increase by 20 and then stay at 60kpa untill 1.5yr. how I can programm this? 3.then my third row is when z=0 (z refere to my soil depth, so when is zero it means on the surface) and the condition here is that when at time zero I apply a load of 0kpa or 40Kpa (what ever the value is then the value that it should put underneath t=0 and infront of z=0 should be equal to that load). if the load change constanlty or not changing the values in row 3, infront of the z=0 for other time intervals should also be zero. the only case that it is not is when we have a abrupt change at a time interval, in this case i need to say that do two calcuation at this time, once the value should be before abrupt change and once at the time time interval calculation with abrupt change . eg: time(year) 0 0.25 0.5 0.75 1 1.25 1.5 q(load, kpa) 40 40 40 40:60 60 60 60 z=0 40 0 0 0: 20 0 0 0 4. then I have defined that how many layers of soil I have, but I dont know how i should apply it here so that for instance, I have four layers +my z=0 layer, I only did layer one how it could continue down four other rows and apply the "formula" to calculate the space between, like this time(year) 0 0.25 0.5 0.75 1 1.25 1.5 q(load, kpa) 40 40 40 40:60 60 60 60 z=0 40 0 0 0: 20 0 0 0 z=1 use this formual here and do all calculation for the sapces available z=2 z=3 z=4 do down like this and stop after it reaches the value that i have already defined. I know its along question , probably I know nothing about excel only some basic things so I hope this look easy to you all and help me out, please. i am looking forward to here from you as soon as possible. thank you so much in advance. Kind regards |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Using Instr to produce table contents | Excel Programming | |||
Does Excel produce a table of contents? | Excel Discussion (Misc queries) | |||
Why does this produce an error? | Excel Programming | |||
In a table produce an value by column heading and row heading | Excel Worksheet Functions | |||
produce a formulate to produce assigned seats for dinner | Excel Worksheet Functions |