Home |
Search |
Today's Posts |
|
#1
![]()
Posted to microsoft.public.excel.programming
|
|||
|
|||
![]()
(re-post, hopefully format better)
required supplied available total 36 36 9 15 27 32 40 123 2 2 -2 -2 3 3 -3 -3 5 5 -5 -5 10 10 -10 -10 16 16 -16 -16 etc remaining 4 0 11 32 40 87 "John Cole, Jr." wrote: Thanks for the help, but I'm never going to be able to do what is necessary. What about a shortcut. Let's say Column "A" has the lengths I need while Column "B" has the Lengths available. Is there a way I can run a macro to take the longest length in A, assign it to longest in B, therefore shrinking that pipes length. Then take the second is column A and assign it to the next longest and so on. When part of a length is used, it should be placed back in the selection group with the length previously taken subtracted from it. This would be some form of a loop. JC |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Lengths of LISTS | Excel Discussion (Misc queries) | |||
hardship letter explaining devastating loss property loss financi | Excel Discussion (Misc queries) | |||
Economical grouping of lengths out of much longer lengths | Excel Worksheet Functions | |||
Chart lengths | Charts and Charting in Excel | |||
Weight loss line chart to monitor weight loss progress | Charts and Charting in Excel |