Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Posted to microsoft.public.excel.programming
Jay Jay is offline
external usenet poster
 
Posts: 671
Default Change order in a multi-shape group?

Hi - Excel2003 VBA: How do you change the order of a shape within a
multi-shape group ? The following statement doesn't work, but illustrates the
desired result:

ActiveSheet.Shapes("Group 3").GroupItems(2).ZOrder msoSendToBack

Thanks !
Jay
PS: Also, is there a way to assign a fixed name to a shape or multi-shape
group so that the name does not change when the shape is manipulated
(grouped, ungrouped, regrouped, etc.)?
--
Thanks,
Jay
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
tab order for multi-range selections Phil Excel Discussion (Misc queries) 1 August 10th 09 04:01 AM
How do I keep multi-subtotals in the same order within the report K Stowers Excel Worksheet Functions 1 December 29th 05 06:47 PM
text in shape group pshen Excel Programming 2 June 8th 05 07:34 PM
Get the name of a group given the reference to a shape within the group Andrew[_16_] Excel Programming 5 January 1st 04 01:08 AM
Reference oleobject within shape group Andrew[_16_] Excel Programming 4 December 24th 03 02:31 AM


All times are GMT +1. The time now is 05:55 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"