ExcelBanter

ExcelBanter (https://www.excelbanter.com/)
-   Excel Programming (https://www.excelbanter.com/excel-programming/)
-   -   Change order in a multi-shape group? (https://www.excelbanter.com/excel-programming/358154-change-order-multi-shape-group.html)

Jay

Change order in a multi-shape group?
 
Hi - Excel2003 VBA: How do you change the order of a shape within a
multi-shape group ? The following statement doesn't work, but illustrates the
desired result:

ActiveSheet.Shapes("Group 3").GroupItems(2).ZOrder msoSendToBack

Thanks !
Jay
PS: Also, is there a way to assign a fixed name to a shape or multi-shape
group so that the name does not change when the shape is manipulated
(grouped, ungrouped, regrouped, etc.)?
--
Thanks,
Jay


All times are GMT +1. The time now is 05:05 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
ExcelBanter.com