Hi all. I am doing some Excel VBA programming for an engineering group
in the area of production scheduling. Most of it is going OK but they have some ideas for a bit of a dream tool. Eventually this stuff will be replaced by SAP APO, but right now it is all in Excel. They want to show visually the status of various schedules, in a format very similar to a gantt chart in MSProject. Each day they want to play with the schedules, taking one schedule and lengthening it or shortening it not by changing the data, but by dragging the actual schedule itself longer or shorter. Can this be done in Excel? Should I be trying to use an MSProject control through ActiveX? Is there a simpler and more suitable ActiveX control anyone can recommend? Maybe the the control would need to be bound to the data in the underlying cells somehow (don't know how this would work)? Say you had dates in coloumns across the top of the sheet. The control would basically be a coloured rectangle that the user can stretch to cover 3 days instead of two if the schedule slips - or shorten to one day if the ship is loaded quicker than expected. It's hard to explain in words - anyway, like a Gantt chart. Any ideas? Thanks Simon Cullen Simon.Cullen@ BHPBilliton.com (remove the space to reply) |
#2
![]()
Posted to microsoft.public.excel.programming
|
|||
|
|||
![]()
See answer to later posting of this question.
-- Regards, Tom Ogilvy wrote in message oups.com... Hi all. I am doing some Excel VBA programming for an engineering group in the area of production scheduling. Most of it is going OK but they have some ideas for a bit of a dream tool. Eventually this stuff will be replaced by SAP APO, but right now it is all in Excel. They want to show visually the status of various schedules, in a format very similar to a gantt chart in MSProject. Each day they want to play with the schedules, taking one schedule and lengthening it or shortening it not by changing the data, but by dragging the actual schedule itself longer or shorter. Can this be done in Excel? Should I be trying to use an MSProject control through ActiveX? Is there a simpler and more suitable ActiveX control anyone can recommend? Maybe the the control would need to be bound to the data in the underlying cells somehow (don't know how this would work)? Say you had dates in coloumns across the top of the sheet. The control would basically be a coloured rectangle that the user can stretch to cover 3 days instead of two if the schedule slips - or shorten to one day if the ship is loaded quicker than expected. It's hard to explain in words - anyway, like a Gantt chart. Any ideas? Thanks Simon Cullen Simon.Cullen@ BHPBilliton.com (remove the space to reply) |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
In Excel, how can I require a field to contain data? | Excel Discussion (Misc queries) | |||
Require a macro for Excel 2007 | New Users to Excel | |||
Is there a way to require a cell to be completed in Excel? | Excel Worksheet Functions | |||
Excel Chart - Require a Formula | Excel Worksheet Functions | |||
Require Tmplwiz.exe for Excel 2003 | Excel Discussion (Misc queries) |