Home |
Search |
Today's Posts |
#1
Posted to microsoft.public.excel.programming
|
|||
|
|||
Interdependent flow scheduling
In a manufacturing pipeline, there is a point where the time spent at a
given station is based on the mix of product types present at that station. The metric involved is viscosity, and the time spent at that station can be calculated as a function of average viscosity of all products at the station. What I want to do is schedule several products to flow through the pipeline, and calculate their time to completion. Most of the scheduling applications I have seen require independent times for each product, or independent stochastic approximations. Has anyone seen or used formulas/functions that allow interaction? Maybe different sizes, weights, or combined pressures through a pipe? |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Scheduling | Excel Discussion (Misc queries) | |||
Where are the flow shape and flow connector tabs in Vista? | Charts and Charting in Excel | |||
Setting up interdependent worksheets | Setting up and Configuration of Excel | |||
How do I label flow connectors in and excel flow chart? | Excel Discussion (Misc queries) | |||
Interdependent page fields in one pivot table | Excel Discussion (Misc queries) |