Default need time calculation formula

I have a spreadsheet with the collowing columns in P,Q,R,S - planne
time on, actual time on, planned time off, actual time off. and i
column U I have Hours Lost

I've been trying to create a formula which will correctly calculate th
hours lost. The problem is taking into account that sometimes th
planned time on can be before midnight, and the actual time on may b
after midnight so the formula is failing because its not calculatin
this properly. The formula I currently have which works other tha
this is

=IF(AND(ISNUMBER(P821),ISNUMBER(R821),ISNUMBER(Q82 1),ISNUMBER(S821)),(Q821-P821)+(R821-S821),"N/A")

It first checks that each of the 4 columns ALL contain a number (i.e
they arent blank or saying N/A), if they dont then set it to N/A. The
planned on-actual on + planned off-actual off = hours lost. but thi
will not take into account that the planned time may be before midnigh
and the actual might be after midnight if they started late.
It then gives ###### in the cell because it thinks time has bee
gained. So I would like to show time lost as -hh:mm and time gained a
+hh:hh in the cell if this is possible, as well as calculating the los
hours properly.

an example of the problem would be P2=23:30, Q2=01:20, R2=04:45
S2=04:45. the formula then thinks it has gained hours which is wrong
and also doesnt show the number of hours and mins gained. The cel
format for the hours lost is hh:mm.

Thank

--
Message posted from http://www.ExcelForum.com

  #2   Report Post  
Posted to microsoft.public.excel.programming
external usenet poster
 
Posts: 5,302
Default need time calculation formula

Hi Neowok,

Try using the Custom format:

[hh]:mm


---
Regards,
norman




"neowok " wrote in message
...
I have a spreadsheet with the collowing columns in P,Q,R,S - planned
time on, actual time on, planned time off, actual time off. and in
column U I have Hours Lost

I've been trying to create a formula which will correctly calculate the
hours lost. The problem is taking into account that sometimes the
planned time on can be before midnight, and the actual time on may be
after midnight so the formula is failing because its not calculating
this properly. The formula I currently have which works other than
this is


=IF(AND(ISNUMBER(P821),ISNUMBER(R821),ISNUMBER(Q82 1),ISNUMBER(S821)),(Q821-P
821)+(R821-S821),"N/A")

It first checks that each of the 4 columns ALL contain a number (i.e.
they arent blank or saying N/A), if they dont then set it to N/A. Then
planned on-actual on + planned off-actual off = hours lost. but this
will not take into account that the planned time may be before midnight
and the actual might be after midnight if they started late.
It then gives ###### in the cell because it thinks time has been
gained. So I would like to show time lost as -hh:mm and time gained as
+hh:hh in the cell if this is possible, as well as calculating the lost
hours properly.

an example of the problem would be P2=23:30, Q2=01:20, R2=04:45,
S2=04:45. the formula then thinks it has gained hours which is wrong,
and also doesnt show the number of hours and mins gained. The cell
format for the hours lost is hh:mm.

Thanks


---
Message posted from http://www.ExcelForum.com/



  #3   Report Post  
Posted to microsoft.public.excel.programming
external usenet poster
 
Posts: 1
Default need time calculation formula

ok ill have a look at that (think ive got the formula worked out now.

whats the difference between [hh]:mm and hh:mm ? im guessing [hh] wil
accept negative values

--
Message posted from http://www.ExcelForum.com

  #4   Report Post  
Posted to microsoft.public.excel.programming
external usenet poster
 
Posts: 27,285
Default need time calculation formula

=IF(AND(ISNUMBER(P821),ISNUMBER(R821),ISNUMBER(Q82 1),ISNUMBER(S821)),((Q821-
P821)+(P821Q821))*24+((R821-S821)+(S821R821))*24,"N/A")

format as General.

--
Regards,
Tom Ogilvy


"neowok " wrote in message
...
I have a spreadsheet with the collowing columns in P,Q,R,S - planned
time on, actual time on, planned time off, actual time off. and in
column U I have Hours Lost

I've been trying to create a formula which will correctly calculate the
hours lost. The problem is taking into account that sometimes the
planned time on can be before midnight, and the actual time on may be
after midnight so the formula is failing because its not calculating
this properly. The formula I currently have which works other than
this is


=IF(AND(ISNUMBER(P821),ISNUMBER(R821),ISNUMBER(Q82 1),ISNUMBER(S821)),(Q821-P
821)+(R821-S821),"N/A")

It first checks that each of the 4 columns ALL contain a number (i.e.
they arent blank or saying N/A), if they dont then set it to N/A. Then
planned on-actual on + planned off-actual off = hours lost. but this
will not take into account that the planned time may be before midnight
and the actual might be after midnight if they started late.
It then gives ###### in the cell because it thinks time has been
gained. So I would like to show time lost as -hh:mm and time gained as
+hh:hh in the cell if this is possible, as well as calculating the lost
hours properly.

an example of the problem would be P2=23:30, Q2=01:20, R2=04:45,
S2=04:45. the formula then thinks it has gained hours which is wrong,
and also doesnt show the number of hours and mins gained. The cell
format for the hours lost is hh:mm.

Thanks


---
Message posted from http://www.ExcelForum.com/



  #5   Report Post  
Posted to microsoft.public.excel.programming
external usenet poster
 
Posts: 27,285
Default need time calculation formula

You can display negative time unless you change your setting in the
Calculation Tab to use the 1904 time system (default in the MAC). This will
change any existing dates in any workbook you open to be off by 4 years (if
they used the other system).

[hh] will allow excel to display time in excess of 24 hours. (but I doubt
it solves your current problem).

--
Regards,
Tom Ogilvy



"neowok " wrote in message
...
ok ill have a look at that (think ive got the formula worked out now.

whats the difference between [hh]:mm and hh:mm ? im guessing [hh] will
accept negative values?


---
Message posted from http://www.ExcelForum.com/





  #6   Report Post  
Posted to microsoft.public.excel.programming
external usenet poster
 
Posts: 5,302
Default need time calculation formula

Hi Neowork,

My apologies, I mis-read your initial post.

whats the difference between [hh]:mm and hh:mm ? im guessing [hh] will
accept negative values?



The custom format allows times to be displayed without overflowing into
days and therefore .enables the display of times greater than 24 hours.


---
Regards,
Norman



  #7   Report Post  
Posted to microsoft.public.excel.programming
external usenet poster
 
Posts: 27,285
Default need time calculation formula

can should be can't
as in :

You can't display negative time unless

--
Regards,
Tom Ogilvy


"Tom Ogilvy" wrote in message
...
You can display negative time unless you change your setting in the
Calculation Tab to use the 1904 time system (default in the MAC). This

will
change any existing dates in any workbook you open to be off by 4 years

(if
they used the other system).

[hh] will allow excel to display time in excess of 24 hours. (but I

doubt
it solves your current problem).

--
Regards,
Tom Ogilvy



"neowok " wrote in message
...
ok ill have a look at that (think ive got the formula worked out now.

whats the difference between [hh]:mm and hh:mm ? im guessing [hh] will
accept negative values?


---
Message posted from http://www.ExcelForum.com/





  #8   Report Post  
Posted to microsoft.public.excel.programming
external usenet poster
 
Posts: 1
Default need time calculation formula

ok, i modified my formula to correctly catch instances where the planne
might be before midnight and the actual might be after using

=IF(AND(P50.791666,Q5<0.1875),(Q5-P5+1)+(R5-S5),(Q5-P5)+(R5-S5))

the 0.791666 is equivalent to 19:00 and the 0.1875 is 04:30, basicall
if planned start is after 7pm, and actual start is before 4.30am the
add 24 hours to the result, else both planned and actual are eithe
before or after midnight and so calculate normally. This seems to b
catching all instances of it.

I wont bother with the negative time for now

Thank

--
Message posted from http://www.ExcelForum.com

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Formula For Time Duration Calculation Deen Excel Discussion (Misc queries) 1 March 21st 10 01:55 AM
Time calculation or formula Lise Excel Discussion (Misc queries) 2 July 2nd 08 08:20 AM
create time calculation formula Jcraig713 Excel Discussion (Misc queries) 3 June 28th 06 01:24 PM
formula date and time calculation changetires Excel Discussion (Misc queries) 8 June 27th 06 03:01 PM
Time Calculation Formula! Mike Excel Discussion (Misc queries) 5 July 23rd 05 04:37 AM


All times are GMT +1. The time now is 02:57 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"