ExcelBanter

ExcelBanter (https://www.excelbanter.com/)
-   Excel Programming (https://www.excelbanter.com/excel-programming/)
-   -   Processing Overhead during Cut/Insert (https://www.excelbanter.com/excel-programming/302094-processing-overhead-during-cut-insert.html)

Phil Kenchatt

Processing Overhead during Cut/Insert
 
I have some code that I would like to optimise because it can run
quite slowly;

In a procedure that involves numerous Cut & Insert operations is there
a greater processing overhead if one references the EntireRow as
opposed to a Range.

I would be grateful for any comments

Kind Regards
Phil

Cesar Zapata[_2_]

Processing Overhead during Cut/Insert
 



you can try to copy and destination then clearcontents instead of cut
and paste


for example

Sub test()
Range("a1:a10").Copy Destination:=Range("b1:b10")
Range("a1:a10").ClearContents

End Sub


Post your code may be there is something else slowing it.


Cesar Zapata

Phil Kenchatt wrote:

I have some code that I would like to optimise because it can run
quite slowly;

In a procedure that involves numerous Cut & Insert operations is there
a greater processing overhead if one references the EntireRow as
opposed to a Range.

I would be grateful for any comments

Kind Regards
Phil



All times are GMT +1. The time now is 05:29 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
ExcelBanter.com