I use an excel worksheet to make a weekly graphical plan.
Therefore, I work in 4 columns, where each column presents a production-line
and is divided in 1 cell/hour.
In the columns I draw textboxes for the different articles dat are planned,
one under the other.
In the textboxes, I type the name of the article.
Depending on how the production lines are doing, I move the textboxes down-
or upwards.
Some periodes are fixed; ie: there's a maintenance planned for 8 hours, that
is fixed at wednesday 8am. When I move the textboxes down, I must be careful
to let the maintenance-time free!

Are there any suggestions to automate some things in such a planning? Note
that the length of the texboxes varies on the amount of needed production
for each article. There are weekly about 10 articles for each line.

Or should I use something else than excel?

Piet


  #2   Report Post  
Posted to microsoft.public.excel.programming
external usenet poster
 
Posts: 115
Default Graphical plan

Hi Piet -

You might like to try a gantt chart. You can build one in Excel, or use
a scheduling program, like MS Project or the like. For a few suggestions
in Excel, look he

Simple How To Article:
http://pubs.logicalexpressions.com/P...cle.asp?ID=343

Links:
http://peltiertech.com/Excel/Charts/GanttLinks.html

- Jon
-------
Jon Peltier, Microsoft Excel MVP
Peltier Technical Services
Tutorials and Custom Solutions
http://PeltierTech.com/
_______

piet wrote:

I use an excel worksheet to make a weekly graphical plan.
Therefore, I work in 4 columns, where each column presents a production-line
and is divided in 1 cell/hour.
In the columns I draw textboxes for the different articles dat are planned,
one under the other.
In the textboxes, I type the name of the article.
Depending on how the production lines are doing, I move the textboxes down-
or upwards.
Some periodes are fixed; ie: there's a maintenance planned for 8 hours, that
is fixed at wednesday 8am. When I move the textboxes down, I must be careful
to let the maintenance-time free!

Are there any suggestions to automate some things in such a planning? Note
that the length of the texboxes varies on the amount of needed production
for each article. There are weekly about 10 articles for each line.

Or should I use something else than excel?

Piet



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Graphical Indicators Formula Gary Excel Discussion (Misc queries) 1 July 29th 08 11:39 AM
graphical indicator HL Excel Discussion (Misc queries) 1 March 28th 07 06:22 PM
Material Requirements Plan (MRP) and Capacity Requirements Plan (C Tricia Young Excel Worksheet Functions 1 February 1st 07 06:55 AM
Graphical Representation cityinday Excel Discussion (Misc queries) 4 March 19th 06 04:44 AM
graphical problems Damsel in distress Charts and Charting in Excel 0 April 5th 05 02:47 PM


All times are GMT +1. The time now is 10:59 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"