I have a projects worksheet in which I have a Current Date Cell ("F1")
and four columns ("A, B, C, D") which have dates.

"A1" = Estimated Start Date
"B1" = Estimated Finish Date
"C1" = Actual Start Date
"D1" = Actual Finish Date

Each project has the same set of "A-D" dates.

I want to be able to do a 3 month projected projects chart (or list)
which will show the current date + columns "A1 thru D1" dates. For
example:

Current date = 7/24/03

Projected Project Dates:

Current Month Next Month Two Months from Now
A1-D1 A1-D1 A1-D1

Is there a macro that would give me this information. Or, code that
will allow me to do this?
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Projected Dates.... John Smith[_7_] Excel Discussion (Misc queries) 0 January 19th 10 11:36 PM
Listing Projects based on Manager Name Pritesh[_2_] Excel Discussion (Misc queries) 10 September 24th 09 01:45 PM
Calculating inclusive dates spike Excel Discussion (Misc queries) 2 March 2nd 08 10:13 PM
Calculating Projected Dates [email protected] Excel Worksheet Functions 2 March 28th 07 03:04 AM
Locating a range of dates and listing somewhere else? A.S. Excel Discussion (Misc queries) 1 February 6th 07 10:43 PM


All times are GMT +1. The time now is 10:34 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"