Home |
Search |
Today's Posts |
|
#1
![]()
Posted to microsoft.public.excel.misc
|
|||
|
|||
![]()
I have a 1500+ row by 36 column spreadsheet. I link in three different
spreadsheets (each representing approximately 25% of the columns). Two files link fairly quickly (30 seconds or so). The third file takes 5-7 minutes. How can I improve the performance of the linking process? The three external files are all on the same network folder. |
#2
![]()
Posted to microsoft.public.excel.misc
|
|||
|
|||
![]() I've found that performance is much quicker when the linked files are open at the same time Regards Mike -- Mikeopolo ------------------------------------------------------------------------ Mikeopolo's Profile: http://www.excelforum.com/member.php...o&userid=18570 View this thread: http://www.excelforum.com/showthread...hreadid=530338 |
#3
![]()
Posted to microsoft.public.excel.misc
|
|||
|
|||
![]()
I'd open the files, too.
Or move them to a local folder on my harddrive. Using formulas to enter NULL cell values wrote: I have a 1500+ row by 36 column spreadsheet. I link in three different spreadsheets (each representing approximately 25% of the columns). Two files link fairly quickly (30 seconds or so). The third file takes 5-7 minutes. How can I improve the performance of the linking process? The three external files are all on the same network folder. -- Dave Peterson |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Problem with updating external links | Excel Discussion (Misc queries) | |||
External Links - Removel | Excel Discussion (Misc queries) | |||
Updating External Links | Excel Discussion (Misc queries) | |||
External Links not updating | Excel Discussion (Misc queries) | |||
Links updating? | Excel Discussion (Misc queries) |