Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Posted to microsoft.public.excel.misc
greghenry
 
Posts: n/a
Default How do I change order of rows in pivot table?

The excel pivot table tutorial shows regions as rows in alphabetical order.
I understand I can use the sort command to reverse that order, but how do I
specify the order of the regions as north, south, east, west? Thanks.
- greg
  #2   Report Post  
Posted to microsoft.public.excel.misc
Nikki
 
Posts: n/a
Default How do I change order of rows in pivot table?

click on south, hold the left key on the mouse and drag South below North and
release the key. Now South should be below north. hope this helps.

Nikki

"greghenry" wrote:

The excel pivot table tutorial shows regions as rows in alphabetical order.
I understand I can use the sort command to reverse that order, but how do I
specify the order of the regions as north, south, east, west? Thanks.
- greg

  #3   Report Post  
Posted to microsoft.public.excel.misc
greghenry
 
Posts: n/a
Default How do I change order of rows in pivot table?

Oh. That was too easy, huh? Thanks!
--
- greg


"Nikki" wrote:

click on south, hold the left key on the mouse and drag South below North and
release the key. Now South should be below north. hope this helps.

Nikki

"greghenry" wrote:

The excel pivot table tutorial shows regions as rows in alphabetical order.
I understand I can use the sort command to reverse that order, but how do I
specify the order of the regions as north, south, east, west? Thanks.
- greg

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Select all subtotal rows on Pivot Table Marcotte A Excel Worksheet Functions 2 February 23rd 06 06:10 PM
Pivot Chart won't save order change of data MargaretBeckbury Excel Discussion (Misc queries) 1 January 18th 06 04:54 PM
pivot table sort entries that don't yet appear in table rachael Excel Discussion (Misc queries) 11 September 19th 05 11:29 PM
Pivot Tables & not printing blank rows (revisited) [email protected] Excel Discussion (Misc queries) 1 August 4th 05 07:42 AM
Pivot Table - max rows allowed in data range dmotika Excel Discussion (Misc queries) 2 May 26th 05 05:52 PM


All times are GMT +1. The time now is 02:35 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"