Home |
Search |
Today's Posts |
|
#1
![]()
Posted to microsoft.public.excel.misc
|
|||
|
|||
![]() That wont help for two reasons: 1. It is not possible to edit the links in the cells because the contain formulas so long, that excel cant change the link sources...it says "cant change link, the formula is too long". But more importantly: 2. Because it does it every time I open the sheet and I dont have time to change links on every network sheet i open during the days as there are many links and I work in a lot of different network sheets. But thanks for the reply. -- 50pingviner ------------------------------------------------------------------------ 50pingviner's Profile: http://www.excelforum.com/member.php...o&userid=29298 View this thread: http://www.excelforum.com/showthread...hreadid=490139 |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
How to change reference to other worksheet by changing one cell? | Excel Worksheet Functions | |||
Error "Unable to save external link values" | Excel Discussion (Misc queries) | |||
Problem with formulas changing cell reference | Excel Discussion (Misc queries) | |||
changing the formula's row reference | Excel Discussion (Misc queries) | |||
changing multiple cells from relative to absolute reference | Excel Discussion (Misc queries) |