LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Box666
 
Posts: n/a
Default Calculation with Working day of the year

Using the "standard formula" I am able to work out that (say)the 21st
June is working day 117 for this year using
=NETWORKDAYS($U$4;B17;$V$3:$AE$5)- where U4 is 01/01/2005, B17 is
21/06/2005 and V3 to AE5 is a list of non working days.

I now need to know what working day 117 was last year, is it possible
to start with working day no. and then work out the date?

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Automatic calculation is not working susang Excel Discussion (Misc queries) 4 November 4th 05 03:51 PM
Commission Calculation nospaminlich Excel Worksheet Functions 8 November 1st 05 02:47 PM
Working days left in the month compared to previous months qwopzxnm Excel Worksheet Functions 8 October 24th 05 08:00 PM
Is the IRR calculation based on cash flows at beginning of year? sammad Excel Worksheet Functions 1 September 6th 05 05:15 PM
Calculation Setting in Excel Stuart Bisset Excel Discussion (Misc queries) 0 June 17th 05 09:54 AM


All times are GMT +1. The time now is 07:42 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"