LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Big Rick
 
Posts: n/a
Default 4 and 5 week months

In my current timesheets, I have to manually decide wether each month is 4 or
5 week month. I simply do this by putting a 4 or 5 in $A$44.
The formula I have in the date cells (B37:B43) is
=IF($A$44=4,"---",$B$5+28 =IF($A$44=4,"---",$B$5+29 etc

The criteria for wether it is a 4 or 5 week month is as follows.
e.g. 1
B37 = 1 May 06. Therefore B35 will be 28 May 06.
It is then only 3 days till the actual end of month making this a 4 week
month.

e.g. 2
b37 = 29 May 06. Therefore B35 will be 25 June 06.
It is then 5 days till the actual end of month making this a 5 week month.

The actual criteria is 3 or less days = 4 week month or 4 or more days = 5
week month. Is it possible to put a formula in place to make this automated.
Hope you can understand this explanation.

Thanking you in anticipation.
--
Big Rick
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
4 or 5 week months? Matt_hull1979 Excel Discussion (Misc queries) 6 September 7th 05 09:31 AM
Why "datedif" function results sometimes negative numbers? Ambrosiy Excel Worksheet Functions 1 July 8th 05 11:29 AM
user defined function Brian Rogge Excel Worksheet Functions 5 May 23rd 05 06:21 PM
Line or bar graphs for tracking stocks profit and loss. Mocity Charts and Charting in Excel 1 January 21st 05 01:21 AM
Weekly data allocated to months Henry Bolton Excel Worksheet Functions 2 December 13th 04 02:15 PM


All times are GMT +1. The time now is 06:45 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"