Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
tdennis14
 
Posts: n/a
Default auto fill row with dates

I want to create a column that automatically fills with dates and I want to
insert columns for homework assignments in as well. the problem is getting
it to only place dates that are school days and being able to skip columns
that have the homework assignments in them. If anyone has an idea it would
be appreciated.
  #2   Report Post  
Anne Troy
 
Posts: n/a
Default auto fill row with dates

It would probably be VERY helpful if you could give us exact for-instances.
Such as, I want to fill column A, C, and D with dates beginning with the 2nd
row, and running for 30 days... something like that.
************
Anne Troy
www.OfficeArticles.com

"tdennis14" wrote in message
...
I want to create a column that automatically fills with dates and I want to
insert columns for homework assignments in as well. the problem is
getting
it to only place dates that are school days and being able to skip columns
that have the homework assignments in them. If anyone has an idea it
would
be appreciated.



  #3   Report Post  
tdennis14
 
Posts: n/a
Default auto fill row with dates

I am making a grade sheet where attendance counts toward credit so i want to
have columns with dates that will tell if they were in attendence but on days
that they have homework I need to be able to add columns between the dated
columns . What I would like to do is have a list of the days that are school
days and have excel insert them in order when I tell it to where it tell it
to.

"Anne Troy" wrote:

It would probably be VERY helpful if you could give us exact for-instances.
Such as, I want to fill column A, C, and D with dates beginning with the 2nd
row, and running for 30 days... something like that.
************
Anne Troy
www.OfficeArticles.com

"tdennis14" wrote in message
...
I want to create a column that automatically fills with dates and I want to
insert columns for homework assignments in as well. the problem is
getting
it to only place dates that are school days and being able to skip columns
that have the homework assignments in them. If anyone has an idea it
would
be appreciated.




  #4   Report Post  
exceluserforeman
 
Posts: n/a
Default auto fill row with dates

Hi,
You will need a Specific Purpose userform utility for this as your school
days will be different to other schhols and even countries.

You can send me the data and I will create one for you.

you can see my Excel Stuff at
http://www.geocities.com/excelmarksway


- mark

"tdennis14" wrote:

I want to create a column that automatically fills with dates and I want to
insert columns for homework assignments in as well. the problem is getting
it to only place dates that are school days and being able to skip columns
that have the homework assignments in them. If anyone has an idea it would
be appreciated.

  #5   Report Post  
tdennis14
 
Posts: n/a
Default auto fill row with dates

I would ratherlearn hoowtodoit myself.

"exceluserforeman" wrote:

Hi,
You will need a Specific Purpose userform utility for this as your school
days will be different to other schhols and even countries.

You can send me the data and I will create one for you.

you can see my Excel Stuff at
http://www.geocities.com/excelmarksway


- mark

"tdennis14" wrote:

I want to create a column that automatically fills with dates and I want to
insert columns for homework assignments in as well. the problem is getting
it to only place dates that are school days and being able to skip columns
that have the homework assignments in them. If anyone has an idea it would
be appreciated.



  #6   Report Post  
exceluserforeman
 
Posts: n/a
Default auto fill row with dates

Then why did you ask for Help?
Use the visual Basic Help Index in the Visual Basic Editor not the Excel Help.
If you fiind it too complex, you can always come begging to me. I do not
charge any fees and I do not guarantee results.

regards

Mark

"tdennis14" wrote:

I would ratherlearn hoowtodoit myself.

"exceluserforeman" wrote:

Hi,
You will need a Specific Purpose userform utility for this as your school
days will be different to other schhols and even countries.

You can send me the data and I will create one for you.

you can see my Excel Stuff at
http://www.geocities.com/excelmarksway


- mark

"tdennis14" wrote:

I want to create a column that automatically fills with dates and I want to
insert columns for homework assignments in as well. the problem is getting
it to only place dates that are school days and being able to skip columns
that have the homework assignments in them. If anyone has an idea it would
be appreciated.

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
turn off auto fill options box Excel 2003 martock Excel Discussion (Misc queries) 2 October 13th 05 02:23 AM
How to Auto fill dates on a schedule cardingtr Excel Discussion (Misc queries) 3 September 23rd 05 06:55 AM
Auto Fill Options adarling Excel Discussion (Misc queries) 1 April 8th 05 03:09 AM
Auto fill option box disappeared sbrimley Excel Worksheet Functions 5 February 4th 05 03:21 AM
Auto Fill Options Patti B Excel Discussion (Misc queries) 3 December 9th 04 12:49 AM


All times are GMT +1. The time now is 05:56 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"