I have one workbook that new rows are added to when a new job is bid. I want
to link to a cell with the total that will be at the bottom. What will happen
when a new row is added? I need it to stay on the total value.
--
Greg


Anna

Are you needing to be linked to the same cell? or do you need the link to
stay with the column total it was initially linked to?

"Greg" wrote:

I have one workbook that new rows are added to when a new job is bid. I want
to link to a cell with the total that will be at the bottom. What will happen
when a new row is added? I need it to stay on the total value.
--
Greg


Dave Peterson

Is that cell with the link on another worksheet in the same workbook?

If yes, then it'll work fine.

If it's in a different workbook, then if both workbooks are open, it'll work
fine. If the "receiving" workbook is closed, then you may have trouble.

If you used something like:
='C:\my documents\excel\[book1.xls]Sheet4'!$A$24
as your link, then it won't work nicely.

But if you name that cell (insert|Name), then your formula could look like:
=book1.xls!myTotal_01

Then it'll work ok.

===
One thing you may want to consider. Put those totals in Row 1 (with headers in
row 2). Then you won't have to worry about where they could be.

And if you use window|freeze panes, those totals will always be visible when
you're playing with your data--no need to scroll down to see the total.

Greg wrote:

I have one workbook that new rows are added to when a new job is bid. I want
to link to a cell with the total that will be at the bottom. What will happen
when a new row is added? I need it to stay on the total value.
--
Greg


--

Dave Peterson

Greg

I'm not sure what you mean. Say I have a sum function in H10 I add a row
above it so the total is now in H11. will my link in the other book update to
H11 or do i have to reassign it?
--
Greg



"Anna" wrote:

Are you needing to be linked to the same cell? or do you need the link to
stay with the column total it was initially linked to?

"Greg" wrote:

I have one workbook that new rows are added to when a new job is bid. I want
to link to a cell with the total that will be at the bottom. What will happen
when a new row is added? I need it to stay on the total value.
--
Greg


Anna

As long as you re-sum the column when you add the new row, the link should
update automatically. If you want a link to reference a static cell reference
that won't change, you would put a $ sign in front of the row number and
column letter (ex. $A$1)
Hope this helps.

"Greg" wrote:

I'm not sure what you mean. Say I have a sum function in H10 I add a row
above it so the total is now in H11. will my link in the other book update to
H11 or do i have to reassign it?
--
Greg



"Anna" wrote:

Are you needing to be linked to the same cell? or do you need the link to
stay with the column total it was initially linked to?

"Greg" wrote:

I have one workbook that new rows are added to when a new job is bid. I want
to link to a cell with the total that will be at the bottom. What will happen
when a new row is added? I need it to stay on the total value.
--
Greg



All times are GMT +1. The time now is 08:52 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
ExcelBanter.com