LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
David
 
Posts: n/a
Default Date formulas needed

Three cells involved:
E4: date entered manually by user
F4: date next IPP due
G4: date next Review due

Need formulas for F4 and G4 to satisfy these conditions:
1) E4 is empty:
F4, G4 = ""
2) E4 <= 21 days from today:
F4 = E4 + 21 days, G4 = E4 + 90 days
3) Else:
F4 = E4 + 6 months, G4 = E4 + 1 year

--
David
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Formulas needed for Calendar? Randy New Users to Excel 4 July 8th 05 02:44 PM
how do i set up a formulas with an if date? Thunley Excel Worksheet Functions 3 February 24th 05 03:36 PM
Excel 2002 date formulas problem Andrew Warren Excel Worksheet Functions 4 January 6th 05 11:35 AM
Using formulas to determine date in one cell based on date in anot Gary Excel Worksheet Functions 2 November 22nd 04 08:11 AM
Tricky formulas needed Myrna Larson Excel Worksheet Functions 2 October 29th 04 03:29 AM


All times are GMT +1. The time now is 05:25 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"