Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
NJ_Mike
 
Posts: n/a
Default How do I change the order of my pivot table?

Pivot table results are always in alphabectical order. Is there a way to
change this order. For example, I have a report set up that creates an
Income Statement with the first dimension being "Income" & "Expense".
Expense always comes before Income because E comes before I, but I want it
the other way around to reflect an actual Income Statement. Can this be done?
  #2   Report Post  
PhilMontUSDA
 
Posts: n/a
Default

In your source table REVERSE the order of the information == DATA SORT
[Column that determines Income or Expense Item] DESCENDING.

Close your Excel file, then re-open.

"NJ_Mike" wrote:

Pivot table results are always in alphabectical order. Is there a way to
change this order. For example, I have a report set up that creates an
Income Statement with the first dimension being "Income" & "Expense".
Expense always comes before Income because E comes before I, but I want it
the other way around to reflect an actual Income Statement. Can this be done?

  #3   Report Post  
CyberTaz
 
Posts: n/a
Default

Hi Mike-

If I interpret you accurately, right-click the "button" caption (or one of
the row/column captions) for the row or column field that you want to change
the order of. Choose Field Settings & click the Advanced button to set
Ascending or Descending. Note, however, that if you leave it set for the
default of Manual you can also use Drag & Drop to arrange the order of the
columns & rows as you wish.

HTH |:)

"NJ_Mike" wrote:

Pivot table results are always in alphabectical order. Is there a way to
change this order. For example, I have a report set up that creates an
Income Statement with the first dimension being "Income" & "Expense".
Expense always comes before Income because E comes before I, but I want it
the other way around to reflect an actual Income Statement. Can this be done?

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Using a Pivot Table Calculated Field to get a Unique Count Mike Struckman Excel Worksheet Functions 1 November 22nd 05 05:32 PM
Pivot Table - Multiple consolidation Range tengreen Excel Worksheet Functions 1 July 1st 05 07:18 PM
Graph from a PIVOT table: update not working. Please Help! Marcus Excel Discussion (Misc queries) 0 June 7th 05 05:53 PM
I am having trouble keeping numbers formatted in a Pivot Table Liana H Excel Discussion (Misc queries) 1 April 22nd 05 07:43 PM
pivot table YingRui Oliviero Excel Discussion (Misc queries) 1 April 12th 05 12:57 PM


All times are GMT +1. The time now is 04:51 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"