Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Joseph
 
Posts: n/a
Default How to change the order in which excel addins gets loaded?

While opening excel, all the excel addins gets loaded in alphabetical order.
Is there any option for changing the order in which they are to be loaded,
i.e. as per our wish.
Can anybody help me out.

Joseph
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
how do I change an excel template into a "workbook" joyce Excel Discussion (Misc queries) 5 April 14th 05 04:38 PM
On a excel protected worksheet, how do I change the tab order? vikgarden Excel Worksheet Functions 3 April 7th 05 04:52 PM
Excel gets subtotals out of order using multiple sorts and subtot. jeffl Excel Discussion (Misc queries) 1 March 29th 05 01:35 AM
Excel should have a quick and simple "change case" function like . NinaSvendsen Excel Worksheet Functions 1 January 28th 05 03:15 PM
In Excel 2000, can I change the direction of the move selection a. GTP Excel Discussion (Misc queries) 2 January 7th 05 01:20 AM


All times are GMT +1. The time now is 06:07 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"