Home |
Search |
Today's Posts |
#1
![]()
Posted to microsoft.public.excel.misc
|
|||
|
|||
![]()
Please advised on how to calculate:
I have a forecast = 39,975 I have a shift qty = 7,535 shift production requirement = 5.3 (39975/7535) What formula will determine the qty of the overage of .3 shifts? Thank you |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Calculation not correct after decresing decimal point | Excel Discussion (Misc queries) | |||
Calculation difference after decresing decimal points | Excel Discussion (Misc queries) | |||
Calculation with Decimal | Excel Worksheet Functions | |||
problem with decimal in calculation | Excel Discussion (Misc queries) | |||
Converting decimal calculation to h:mm format | Excel Worksheet Functions |