Default Date !

Hi,

I have 3 columns which states like this
Col A Col B Col C
Start End status
01-jan-2008 - pending
21-jan-2008 - pending
1-Feb-2008 - pending

End date are not specified as it is not completed.
What i need is - if the status is pending then
count the number of days (pending).
Eg., in the above example all are pending, in my
original file I have completed status(which will have end date).

I thought of using this but unable to get the desired result
=today()-Average(pending dates)

Thanks a lot

  #2   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 3,365
Default Date !

Try starting with this formula in column C (row 2 formula shown)
=IF(B2="","Pending for " & TODAY()-A2 & " days.","Completed")
This assumes that the entries in column B are totally empty until you enter
a completed date into them. That means no dash as you show in your example.

For any given row, you can see that the TODAY()-A2 part of the formula is
calculating the # of days that it has been pending. You could use this in
another column (say column D) just to show the days each one has been pending:
=IF(B2="",TODAY()-A2,"")
and then take an average of the values in column D to get the average number
of days the tasks have been pending - then "" entries won't be used for the
average. Be sure to format the column as General.

Conversely you can use
=IF(B2<"",B2-A2,"")
to get the number of days to complete a job and average the results in that
column to get the average number of days to complete it. Be sure to format
the column as General.

Again, system acting up - this may be double-post. Sorry 'bout that if it
happens.

"muddan madhu" wrote:

Hi,

I have 3 columns which states like this
Col A Col B Col C
Start End status
01-jan-2008 - pending
21-jan-2008 - pending
1-Feb-2008 - pending

End date are not specified as it is not completed.
What i need is - if the status is pending then
count the number of days (pending).
Eg., in the above example all are pending, in my
original file I have completed status(which will have end date).

I thought of using this but unable to get the desired result
=today()-Average(pending dates)

Thanks a lot


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Dates - Need to display date one month prior to user-entered date brettopp Excel Worksheet Functions 13 December 3rd 07 05:58 PM
how to get the random date between the start date and the end date? Sebation Excel Worksheet Functions 3 October 13th 07 12:20 PM
Create a formula in a date range to locate a specific date - ecel util Excel Discussion (Misc queries) 0 February 19th 07 03:03 PM
Report Date - Date Recv = Days Late, but how to rid completed date MS Questionnairess Excel Worksheet Functions 1 January 24th 07 11:05 PM
Date updates from worksheet to chart & changes date to a date series! Help!! Jayjg Charts and Charting in Excel 2 January 22nd 05 03:00 PM


All times are GMT +1. The time now is 08:05 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"