Costed Multi Level BOM
 
I have an file (in excel/access) which states are parent part number (col A),
level (col B), children part number(col C), and qty (col E) for parts
manufactured within my facility. I have a seperate table which summarizes all
the labor $ associated with the different children and parent part numbers. I
am having trouble rolling up the cost of all children into the parent part
numbers in some form of automated step (as I am dealing with ~10000
assemblies at various BOM levels).

--
Message posted via OfficeKB.com
http://www.officekb.com/Uwe/Forums.a...excel/200807/1


Sherry

Costed Multi Level BOM
 
Rob, I am curious; did you ever find a solutio to your problem? I am facing
a very similar problem with rolling up data for a Work Break Down Structure.
If you found a logical way to tackle this problem, would you please share
with me?

Thanks.
Sherry

"RobN via OfficeKB.com" wrote:

I have an file (in excel/access) which states are parent part number (col A),
level (col B), children part number(col C), and qty (col E) for parts
manufactured within my facility. I have a seperate table which summarizes all
the labor $ associated with the different children and parent part numbers. I
am having trouble rolling up the cost of all children into the parent part
numbers in some form of automated step (as I am dealing with ~10000
assemblies at various BOM levels).

--
Message posted via OfficeKB.com
http://www.officekb.com/Uwe/Forums.a...excel/200807/1




All times are GMT +1. The time now is 08:58 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
ExcelBanter.com