Home |
Search |
Today's Posts |
#1
![]()
Posted to microsoft.public.excel.misc
|
|||
|
|||
![]()
Hello,
I have an Excel to track performance. Sheet1 is performance table where user input their ID, date, part#, side, start sequence & stop sequence daily. Then on a reference sheet2 with field: part#, side, sequence#, time (calculated). What I would like to calculate is look at the start & stop sequence based on the part# & side then calculate how long (time) the operator spend on the job (part#). Thanks Example: Sheet1 - User input data ID date part# side start seq stop seq 001 1/8/08 1360-1 1st 100 500 002 1/10/08 1560-3 2nd 600 1000 Sheet2 - Reference part# side start seq time (min) 1360-1 1st 100 5 1360-1 1st 200 10 1360-1 1st 300 10 1360-1 1st 400 30 1360-1 1st 500 15 1360-1 1st 600 60 1560-3 2nd 100 10 ........... Result Sheet3 ID date part# side start seq stop seq Total time (calculated) 001 1/8/08 1360-1 1st 100 500 70 How should i go about linking the two sheets so it will calculate the time based on when he start the sequence to when he stop the sequence? Thanks |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Calculating Regular time, overtime and double time | Excel Worksheet Functions | |||
Calculating time and negative time | Excel Worksheet Functions | |||
calculating timesheet, time-in/time-out = total hours & minutes, . | Excel Worksheet Functions | |||
Calculating days & time left from start date/time to end date/time | Excel Worksheet Functions | |||
Calculating effective time from start/end date+time | Excel Worksheet Functions |