Hello,

I have an Excel to track performance. Sheet1 is performance table where user
input their ID, date, part#, side, start sequence & stop sequence daily. Then
on a reference sheet2 with field: part#, side, sequence#, time (calculated).

What I would like to calculate is look at the start & stop sequence based on
the part# & side then calculate how long (time) the operator spend on the job
(part#). Thanks

Example:
Sheet1 - User input data
ID date part# side start seq stop seq
001 1/8/08 1360-1 1st 100 500
002 1/10/08 1560-3 2nd 600 1000

Sheet2 - Reference
part# side start seq time (min)
1360-1 1st 100 5
1360-1 1st 200 10
1360-1 1st 300 10
1360-1 1st 400 30
1360-1 1st 500 15
1360-1 1st 600 60
1560-3 2nd 100 10
...........

Result
Sheet3
ID date part# side start seq stop seq Total time
(calculated)
001 1/8/08 1360-1 1st 100 500 70

How should i go about linking the two sheets so it will calculate the time