#1   Report Post  
matthew
 
Posts: n/a
Default Linking Returns

Date Return
1/31/04 2.0%
2/28/04 1.0%
3/31/04 3.0%
4/30/04 -2.5%
5/31/04 4.0%

I have a list of 5 years worth of monthly returns or 72 cells with dates and
the corresponding return. If I want to take a date range/period, I would
like it to link those returns. So in my example above if I type in 2/28/04 -
5/31/04 I would like excel to do the following
=((1%+1)*(3%+1)*(-2%+1)*(4%+1)-1)*100 which equals 5.486%. Can this be done
with excel? Thank you.



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Linking worksheets after runnning report Steve Excel Discussion (Misc queries) 0 February 28th 05 09:21 PM
Problem with GEOMEAN - returns #NUM error Dan Knight Excel Worksheet Functions 6 February 17th 05 11:40 PM
When I enter a number in an empty cel, de cel returns the value d. Paul KdN Excel Discussion (Misc queries) 2 January 13th 05 09:23 AM
How do I get carriage returns to not be row delimiters in text fi. RV Excel Discussion (Misc queries) 1 December 16th 04 11:47 PM
GET.CELL Biff Excel Worksheet Functions 2 November 24th 04 07:16 PM


All times are GMT +1. The time now is 08:54 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"