Hi! I would like to know how to figure out a problem. Facts:
1) You have a long series of Year1 through Year x running across row 1
(starting in cell B1) in worksheet PROJECTS. In column A. there is a long
list of project names (starting in cell A2). In the area B2:Z99 there are
numbers.
2) In worksheet TIMING, the same project names are in column A. In row 1
there are actual years. In the area B2:Z99 there is one "x" (representing
each project's start date) in each of the rows. For example, in row 2, say
the "x" is in C2.
3) In worksheet SEQUENCED, I want to put the value of B2 of PROJECTS in the
cell that corresponds to where the "x" is found in TIMING. In this case, the
value in B2 of PROJECTS will go into C2 of SEQUENCED using an if-then
statement. So far, easy.
4) Now, I want the value of the next cells of row 2 of PROJECTS (C2, D2,
etc.) to go into the next cells of row of SEQUENCED (i.e., D2, E2, etc.). I
also want to drag the formula to the right and down so that the proper
sequence is maintained. So, therefore the content of D2 of SEQUENCED is
dependent upon the content of C2, and so on€¦

Thanks,
Daniel

  #2   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 354
Default Sequencing of projects

clarification in part 4: "...to go into the next cells of row 2 of SEQUENCED
...."

"Daniel" wrote:

Hi! I would like to know how to figure out a problem. Facts:
1) You have a long series of Year1 through Year x running across row 1
(starting in cell B1) in worksheet PROJECTS. In column A. there is a long
list of project names (starting in cell A2). In the area B2:Z99 there are
numbers.
2) In worksheet TIMING, the same project names are in column A. In row 1
there are actual years. In the area B2:Z99 there is one "x" (representing
each project's start date) in each of the rows. For example, in row 2, say
the "x" is in C2.
3) In worksheet SEQUENCED, I want to put the value of B2 of PROJECTS in the
cell that corresponds to where the "x" is found in TIMING. In this case, the
value in B2 of PROJECTS will go into C2 of SEQUENCED using an if-then
statement. So far, easy.
4) Now, I want the value of the next cells of row 2 of PROJECTS (C2, D2,
etc.) to go into the next cells of row of SEQUENCED (i.e., D2, E2, etc.). I
also want to drag the formula to the right and down so that the proper
sequence is maintained. So, therefore the content of D2 of SEQUENCED is
dependent upon the content of C2, and so on€¦

Thanks,
Daniel

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
File Save Sequencing: Foo1.xls, Foo2.xls... AH·C Excel Discussion (Misc queries) 3 November 29th 05 11:41 AM
Row Sequencing Mark Excel Worksheet Functions 8 August 18th 05 06:33 PM
Sequencing a Cell over print pages Benjamin Excel Discussion (Misc queries) 0 February 8th 05 10:43 PM
Formula for Sequencing Totals Jeff T Excel Worksheet Functions 13 January 24th 05 03:07 PM
Alphabet sequencing in a conditional format craftwoodman Excel Discussion (Misc queries) 7 January 3rd 05 01:41 AM


All times are GMT +1. The time now is 06:17 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"