Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Posted to microsoft.public.excel.misc
external usenet poster
 
Posts: 1
Default Accessing current project path

in Access I have an embedded spreadsheet and am using an access table to pass
data between the access system and excel.

I need to tell excel the directory that contains the MDB file but I haven't
figured out a way to do this - any ideas?

Thank you
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Trying to report the current phase of a project Jonathan B. Excel Discussion (Misc queries) 2 July 24th 06 04:31 PM
Vlookup to Return a Range of Data Rob Excel Discussion (Misc queries) 13 June 1st 06 04:02 AM
How to convert MS Project to MS Excel. I don't have MS Project. Jane Excel Discussion (Misc queries) 1 February 20th 06 10:01 PM
Cannot save Project file as MS Access file Jumpinjackflash Excel Discussion (Misc queries) 1 January 11th 06 11:35 PM
Subtotal of Subtotal displays Grand Total in wrong row Thomas Born Excel Worksheet Functions 5 January 6th 05 01:46 PM


All times are GMT +1. The time now is 08:50 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"