ExcelBanter

ExcelBanter (https://www.excelbanter.com/)
-   Charts and Charting in Excel (https://www.excelbanter.com/charts-charting-excel/)
-   -   Ploting dates against a calendar and not as a simple events (https://www.excelbanter.com/charts-charting-excel/490-ploting-dates-against-calendar-not-simple-events.html)

Barb Reinhardt

I suspect you want to plot an XY Scatter chart. The dates need to be in a
numeric format to do that.

"Gandalf" wrote in message
...
Probably a simple solution....and staring me in the face.

I have a table containing dates and values. The dates may progress but

the
day interval is variable depending when the values were recorded.

I need to plot the values with the dates on the x axis. So far I can only
get the graph to treat each date as an event, thus the true date interval

is
not reflected. This distorts the graph.

How does one configure Excel to plot against a calendar interval on the x
axis?

Many thanks

G





Gandalf

Ploting dates against a calendar and not as a simple events
 
Probably a simple solution....and staring me in the face.

I have a table containing dates and values. The dates may progress but the
day interval is variable depending when the values were recorded.

I need to plot the values with the dates on the x axis. So far I can only
get the graph to treat each date as an event, thus the true date interval is
not reflected. This distorts the graph.

How does one configure Excel to plot against a calendar interval on the x
axis?

Many thanks

G



Jon Peltier

Numeric, but still in date format. In addition, if the category values for a line
chart are numerical and in a number format, Excel draws a time scale axis, which
accurately represents the elapsed days between dates.

- Jon
-------
Jon Peltier, Microsoft Excel MVP
Peltier Technical Services
Tutorials and Custom Solutions
http://PeltierTech.com/
_______

Barb Reinhardt wrote:

I suspect you want to plot an XY Scatter chart. The dates need to be in a
numeric format to do that.

"Gandalf" wrote in message
...

Probably a simple solution....and staring me in the face.

I have a table containing dates and values. The dates may progress but


the

day interval is variable depending when the values were recorded.

I need to plot the values with the dates on the x axis. So far I can only
get the graph to treat each date as an event, thus the true date interval


is

not reflected. This distorts the graph.

How does one configure Excel to plot against a calendar interval on the x
axis?

Many thanks

G








All times are GMT +1. The time now is 04:52 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
ExcelBanter.com