Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Posted to microsoft.public.excel.charting
external usenet poster
 
Posts: 9
Default How do I change the order of the line versus the marker for a scat

I have a scatter plot with thousands of points (markers only, no line), and
am plotting a second series as a line with only a few hundred points over the
same range of x-values (line only, no markers). I want the line to appear in
front, but Excel 2007 keeps putting the marker symbols in front, which
completely obscures the line.

I have tried changing the series order, but it makes no difference. In the
Chart Tools - Format - Arrange toolbar, there are "Bring to Front" and "Send
to back" buttons, but they are greyed out.

Suggestions?
  #2   Report Post  
Posted to microsoft.public.excel.charting
external usenet poster
 
Posts: 6,582
Default How do I change the order of the line versus the marker for a scat

I presume you mean you're plotting the second series as an XY series with
lines and no markers. If you plot it on the secondary axis, the lines will
appear in front of the markers on the primary axis. If you plot the second
series as a line series rather than XY, its line will be behind any markers
of an XY series.

- Jon
-------
Jon Peltier, Microsoft Excel MVP
Peltier Technical Services, Inc.
http://PeltierTech.com/WordPress/
_______


"GJS001" wrote in message
...
I have a scatter plot with thousands of points (markers only, no line), and
am plotting a second series as a line with only a few hundred points over
the
same range of x-values (line only, no markers). I want the line to appear
in
front, but Excel 2007 keeps putting the marker symbols in front, which
completely obscures the line.

I have tried changing the series order, but it makes no difference. In
the
Chart Tools - Format - Arrange toolbar, there are "Bring to Front" and
"Send
to back" buttons, but they are greyed out.

Suggestions?



  #3   Report Post  
Posted to microsoft.public.excel.charting
external usenet poster
 
Posts: 9
Default How do I change the order of the line versus the marker for a

OK - I was afraid that was the answer. Why don't the "Bring to Front" and
"Send to back" commands work on the markers and lines? That would be a
useful feature.

The secondary axis approach worked perfectly for a single set of markers and
a single line. Does everything plotted on the secondary axis appear in front
of objects plotted on the primary axis? It appears so. The order of
plotting must be (back to front):
1. primary axis lines
2. primary axis markers
3. secondary axis lines
4. secondary axis markers

I was able to set the secondary axis to the same scale as the primary axis,
set the ticks to "none", and set the labels to "none", and it appeared as
though the line was plotted against the primary axis along with the markers.
This was a workaround to not being able to change the order of line plots vs.
marker plots.

Are there good third party graphing packages that integrate with Excel to
provide greater flexibility than Excel Charts for custom tailoring the
graphs? I like the data management/manipulation in Excel, but can't do
everything I would like to with the graphs.

"Jon Peltier" wrote:

I presume you mean you're plotting the second series as an XY series with
lines and no markers. If you plot it on the secondary axis, the lines will
appear in front of the markers on the primary axis. If you plot the second
series as a line series rather than XY, its line will be behind any markers
of an XY series.

- Jon
-------
Jon Peltier, Microsoft Excel MVP
Peltier Technical Services, Inc.
http://PeltierTech.com/WordPress/
_______


"GJS001" wrote in message
...
I have a scatter plot with thousands of points (markers only, no line), and
am plotting a second series as a line with only a few hundred points over
the
same range of x-values (line only, no markers). I want the line to appear
in
front, but Excel 2007 keeps putting the marker symbols in front, which
completely obscures the line.

I have tried changing the series order, but it makes no difference. In
the
Chart Tools - Format - Arrange toolbar, there are "Bring to Front" and
"Send
to back" buttons, but they are greyed out.

Suggestions?




  #4   Report Post  
Posted to microsoft.public.excel.charting
external usenet poster
 
Posts: 6,582
Default How do I change the order of the line versus the marker for a


OK - I was afraid that was the answer. Why don't the "Bring to Front" and
"Send to back" commands work on the markers and lines? That would be a
useful feature.


Bring To Front and related commands work on individual shapes. The chart is
comprised of a large number of elements, which are constructed in a certain
order, and probably messing with that would affect Excel's ability to go
back and make changes to a chart. If you don't care about this
interactivity, you could copy the chart as a picture (hold Shift, click on
the Edit menu, choose Copy Picture, then choose On Screen and Picture
options), paste it, ungroup it, and play with all of the elements.

The secondary axis approach worked perfectly for a single set of markers
and
a single line. Does everything plotted on the secondary axis appear in
front
of objects plotted on the primary axis? It appears so. The order of
plotting must be (back to front):
1. primary axis lines
2. primary axis markers
3. secondary axis lines
4. secondary axis markers


For a given chart type, yes. Further:

Top to bottom:
All XY series (secondary over primary)
All Line series
Bar and Column series
Area series

I was able to set the secondary axis to the same scale as the primary
axis,
set the ticks to "none", and set the labels to "none", and it appeared as
though the line was plotted against the primary axis along with the
markers.
This was a workaround to not being able to change the order of line plots
vs.
marker plots.


After you assign one or more series to the secondary axis, you can go to
Chart menu Options Axes tab, and uncheck the secondary axes. This plots
the secondary series on the primary axes, but keeps the secondary and
primary series separated. This is easier than having to change one set of
axes to match up with the other.

Are there good third party graphing packages that integrate with Excel to
provide greater flexibility than Excel Charts for custom tailoring the
graphs? I like the data management/manipulation in Excel, but can't do
everything I would like to with the graphs.


There are no major packages that interact with Excel that I have any
experience with, though I'm sure some exist. Also, some third party
applications are able to work with Excel data files. There are a ton of
workarounds and small utilities on the internet, including a good number on
my web site. After you learn how the different chart elements interact, you
can figure out ways to make Excel charts show things you wouldn't imagine.

- Jon
-------
Jon Peltier, Microsoft Excel MVP
Peltier Technical Services, Inc.
http://PeltierTech.com/WordPress/
_______


  #5   Report Post  
Posted to microsoft.public.excel.charting
external usenet poster
 
Posts: 9
Default How do I change the order of the line versus the marker for a



"Jon Peltier" wrote:


I was able to set the secondary axis to the same scale as the primary
axis,
set the ticks to "none", and set the labels to "none", and it appeared as
though the line was plotted against the primary axis along with the
markers.
This was a workaround to not being able to change the order of line plots
vs.
marker plots.


After you assign one or more series to the secondary axis, you can go to
Chart menu Options Axes tab, and uncheck the secondary axes. This plots
the secondary series on the primary axes, but keeps the secondary and
primary series separated. This is easier than having to change one set of
axes to match up with the other.


Very cool! Thanks for the tip!


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Change default series line color order Leonard Lan Excel Discussion (Misc queries) 5 July 2nd 08 03:02 AM
change comment marker in Excel Jo Excel Discussion (Misc queries) 8 January 7th 08 11:10 PM
two flavors of formatting patterns (border/area vs. line/marker) [email protected] Excel Discussion (Misc queries) 2 November 9th 07 09:42 PM
XY marker change for entire workbook rnason16 Charts and Charting in Excel 2 February 13th 07 06:29 PM
Arrow on a line chart as a marker sbigelow Charts and Charting in Excel 1 October 10th 05 04:01 AM


All times are GMT +1. The time now is 04:44 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"