Home |
Search |
Today's Posts |
#1
![]()
Posted to microsoft.public.excel.charting
|
|||
|
|||
![]()
I have a scatter plot with thousands of points (markers only, no line), and
am plotting a second series as a line with only a few hundred points over the same range of x-values (line only, no markers). I want the line to appear in front, but Excel 2007 keeps putting the marker symbols in front, which completely obscures the line. I have tried changing the series order, but it makes no difference. In the Chart Tools - Format - Arrange toolbar, there are "Bring to Front" and "Send to back" buttons, but they are greyed out. Suggestions? |
#2
![]()
Posted to microsoft.public.excel.charting
|
|||
|
|||
![]()
I presume you mean you're plotting the second series as an XY series with
lines and no markers. If you plot it on the secondary axis, the lines will appear in front of the markers on the primary axis. If you plot the second series as a line series rather than XY, its line will be behind any markers of an XY series. - Jon ------- Jon Peltier, Microsoft Excel MVP Peltier Technical Services, Inc. http://PeltierTech.com/WordPress/ _______ "GJS001" wrote in message ... I have a scatter plot with thousands of points (markers only, no line), and am plotting a second series as a line with only a few hundred points over the same range of x-values (line only, no markers). I want the line to appear in front, but Excel 2007 keeps putting the marker symbols in front, which completely obscures the line. I have tried changing the series order, but it makes no difference. In the Chart Tools - Format - Arrange toolbar, there are "Bring to Front" and "Send to back" buttons, but they are greyed out. Suggestions? |
#3
![]()
Posted to microsoft.public.excel.charting
|
|||
|
|||
![]()
OK - I was afraid that was the answer. Why don't the "Bring to Front" and
"Send to back" commands work on the markers and lines? That would be a useful feature. The secondary axis approach worked perfectly for a single set of markers and a single line. Does everything plotted on the secondary axis appear in front of objects plotted on the primary axis? It appears so. The order of plotting must be (back to front): 1. primary axis lines 2. primary axis markers 3. secondary axis lines 4. secondary axis markers I was able to set the secondary axis to the same scale as the primary axis, set the ticks to "none", and set the labels to "none", and it appeared as though the line was plotted against the primary axis along with the markers. This was a workaround to not being able to change the order of line plots vs. marker plots. Are there good third party graphing packages that integrate with Excel to provide greater flexibility than Excel Charts for custom tailoring the graphs? I like the data management/manipulation in Excel, but can't do everything I would like to with the graphs. "Jon Peltier" wrote: I presume you mean you're plotting the second series as an XY series with lines and no markers. If you plot it on the secondary axis, the lines will appear in front of the markers on the primary axis. If you plot the second series as a line series rather than XY, its line will be behind any markers of an XY series. - Jon ------- Jon Peltier, Microsoft Excel MVP Peltier Technical Services, Inc. http://PeltierTech.com/WordPress/ _______ "GJS001" wrote in message ... I have a scatter plot with thousands of points (markers only, no line), and am plotting a second series as a line with only a few hundred points over the same range of x-values (line only, no markers). I want the line to appear in front, but Excel 2007 keeps putting the marker symbols in front, which completely obscures the line. I have tried changing the series order, but it makes no difference. In the Chart Tools - Format - Arrange toolbar, there are "Bring to Front" and "Send to back" buttons, but they are greyed out. Suggestions? |
#4
![]()
Posted to microsoft.public.excel.charting
|
|||
|
|||
![]() OK - I was afraid that was the answer. Why don't the "Bring to Front" and "Send to back" commands work on the markers and lines? That would be a useful feature. Bring To Front and related commands work on individual shapes. The chart is comprised of a large number of elements, which are constructed in a certain order, and probably messing with that would affect Excel's ability to go back and make changes to a chart. If you don't care about this interactivity, you could copy the chart as a picture (hold Shift, click on the Edit menu, choose Copy Picture, then choose On Screen and Picture options), paste it, ungroup it, and play with all of the elements. The secondary axis approach worked perfectly for a single set of markers and a single line. Does everything plotted on the secondary axis appear in front of objects plotted on the primary axis? It appears so. The order of plotting must be (back to front): 1. primary axis lines 2. primary axis markers 3. secondary axis lines 4. secondary axis markers For a given chart type, yes. Further: Top to bottom: All XY series (secondary over primary) All Line series Bar and Column series Area series I was able to set the secondary axis to the same scale as the primary axis, set the ticks to "none", and set the labels to "none", and it appeared as though the line was plotted against the primary axis along with the markers. This was a workaround to not being able to change the order of line plots vs. marker plots. After you assign one or more series to the secondary axis, you can go to Chart menu Options Axes tab, and uncheck the secondary axes. This plots the secondary series on the primary axes, but keeps the secondary and primary series separated. This is easier than having to change one set of axes to match up with the other. Are there good third party graphing packages that integrate with Excel to provide greater flexibility than Excel Charts for custom tailoring the graphs? I like the data management/manipulation in Excel, but can't do everything I would like to with the graphs. There are no major packages that interact with Excel that I have any experience with, though I'm sure some exist. Also, some third party applications are able to work with Excel data files. There are a ton of workarounds and small utilities on the internet, including a good number on my web site. After you learn how the different chart elements interact, you can figure out ways to make Excel charts show things you wouldn't imagine. - Jon ------- Jon Peltier, Microsoft Excel MVP Peltier Technical Services, Inc. http://PeltierTech.com/WordPress/ _______ |
#5
![]()
Posted to microsoft.public.excel.charting
|
|||
|
|||
![]() "Jon Peltier" wrote: I was able to set the secondary axis to the same scale as the primary axis, set the ticks to "none", and set the labels to "none", and it appeared as though the line was plotted against the primary axis along with the markers. This was a workaround to not being able to change the order of line plots vs. marker plots. After you assign one or more series to the secondary axis, you can go to Chart menu Options Axes tab, and uncheck the secondary axes. This plots the secondary series on the primary axes, but keeps the secondary and primary series separated. This is easier than having to change one set of axes to match up with the other. Very cool! Thanks for the tip! |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Change default series line color order | Excel Discussion (Misc queries) | |||
change comment marker in Excel | Excel Discussion (Misc queries) | |||
two flavors of formatting patterns (border/area vs. line/marker) | Excel Discussion (Misc queries) | |||
XY marker change for entire workbook | Charts and Charting in Excel | |||
Arrow on a line chart as a marker | Charts and Charting in Excel |