I recently created a chart in Excel 03 which is a combination of a very
formatted line chart, and two bar charts. Picture of the chart is he
http://img.photobucket.com/albums/v1...2785/chart.jpg
To explain whats going on, the user can add in "Milestones" for whatever
date they want, and the milestone will be refelected on the chart at whatever
date they specified. The start and end dates are for the yellow background
bars, which is representative of the duration of the task in question. This
can be updated as time passes.
I've also been asked to add functionality that I'm not sure is possible. I
suppose it is, but I'm having difficulty figuring it out.
As each milestone is added, they also need a description to go along with
them on the chart, and I need this to be added through the spreadsheet. For
example, the spreadsheet would read that Company A (Row 2), Milestone
1(Column 3) is described as (whatever). The CHART would then update to have
a description right next to the milestone in question reading (whatever.)
These all need to update in the correct places to go along with the correct
dates, and if the milestones are changed/if there are milestones added, then
a description can be typed on the speadsheet and seen updated on the chart.
The other functionality requested was that the milestones change color. For
instance, say on the spreadsheet I want a milestone on 6/11/08 to be red. I
would type something like "red" (or a value or.. anything possible) on the
spreadsheet, and the chart would then show a red milestone on that date.

..... I think this might be easier if I didnt have such a complicated chart
of begin with, but as of right now I'm getting pretty desperate!

If anyone can help please respond, thanks in advance!

  #2   Report Post  
Posted to microsoft.public.excel.charting
external usenet poster
 
Posts: 2,489
Default Complicated chart, not sure how to finish it!

Hi,

Does the solution I posted in your thread at Excelforum not help?

Cheers
Andy

--

Andy Pope, Microsoft MVP - Excel
http://www.andypope.info
"jinfanti" wrote in message
...
I recently created a chart in Excel 03 which is a combination of a very
formatted line chart, and two bar charts. Picture of the chart is he
http://img.photobucket.com/albums/v1...2785/chart.jpg
To explain whats going on, the user can add in "Milestones" for whatever
date they want, and the milestone will be refelected on the chart at
whatever
date they specified. The start and end dates are for the yellow
background
bars, which is representative of the duration of the task in question.
This
can be updated as time passes.
I've also been asked to add functionality that I'm not sure is possible.
I
suppose it is, but I'm having difficulty figuring it out.
As each milestone is added, they also need a description to go along with
them on the chart, and I need this to be added through the spreadsheet.
For
example, the spreadsheet would read that Company A (Row 2), Milestone
1(Column 3) is described as (whatever). The CHART would then update to
have
a description right next to the milestone in question reading (whatever.)
These all need to update in the correct places to go along with the
correct
dates, and if the milestones are changed/if there are milestones added,
then
a description can be typed on the speadsheet and seen updated on the
chart.
The other functionality requested was that the milestones change color.
For
instance, say on the spreadsheet I want a milestone on 6/11/08 to be red.
I
would type something like "red" (or a value or.. anything possible) on the
spreadsheet, and the chart would then show a red milestone on that date.

.... I think this might be easier if I didnt have such a complicated chart
of begin with, but as of right now I'm getting pretty desperate!

If anyone can help please respond, thanks in advance!


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Finish Spreadsheet Trying Hard Excel Discussion (Misc queries) 1 May 22nd 06 10:56 AM
Complicated Stacked Bar Chart? Don Cardoza Charts and Charting in Excel 1 December 10th 05 05:14 PM
Need help with complicated chart (xy chart? z axis? not sure!) Patience Charts and Charting in Excel 1 November 5th 05 02:24 PM
How do I chart date ranges with varying start and finish dates? projectplanner Charts and Charting in Excel 4 May 1st 05 11:36 PM
Complicated Pie Chart formula bruiseman Charts and Charting in Excel 3 February 15th 05 03:02 AM


All times are GMT +1. The time now is 01:21 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 ExcelBanter.
The comments are property of their posters.
 

About Us

"It's about Microsoft Excel"