  #5   Report Post  
Posted to microsoft.public.excel.misc
joeu2004 joeu2004 is offline
external usenet poster
 
Posts: 2,059
Default Date Calculation problem

"wins007" wrote:
I need to calculate a new date based on an original date Col A
to which I need to add a figure which relates to number of months
to be added Col B to produce a new date Col C.


Test solutions with 1/31/2009 in A and 1 in B; also with 2/29/2008 in A and
12 in B. My guess is: you would like 2/28/2009 for both. In that case,
use either of the following:

=edate(A1,B1)

=min(date(year(A1),B1+month(A1),day(A1)), date(year(A1),1+B1+month(A1),0)

Copy the format of A1 to C1.

EDATE is preferred. If you get a #NAME error, see the EDATE help page. Use
the latter only if you cannot load the Analysis ToolPak.


----- original message -----

"wins007" wrote in message
...
Hi everyone,

I currently have a problem with the calculation of some dates based on an
existing one. I need to calculate a new date based on an original date Col
A
to which I need to add a figure which relates to number of months to be
added
Col B to produce a new date Col C.

A B C
03/15/2009 2 05/13/2009
04/06/2009 3 04/07/2009
02/28/2009 1 03/28/2009

Your valuable help will be welcomed.

Thanks for your usual support