Try this:
=PT/DAY(DATE(YEAR(Mon),MONTH(Mon),1)-1)
Jeff C wrote:
I need to create a calculated field dividing the sum of one field by the
number of days in the month prior to the date in one of the data fields.
Mon PT
2/4/2008 26
I have tried =Sum(pt)/EOMonth(Mon,-1) and =Sum(pt)int(EOMonth(Mon,-1)) with
no results.
Is there a solution out there?
Thanks in advance
--
Debra Dalgleish
Contextures
www.contextures.com/tiptech.html
Blog:
http://blog.contextures.com