On Thu, 6 Mar 2008 17:43:20 -0500, "Rick Rothstein \(MVP -
VB\)"
wrote:
End of Period:
=A1+39-DAY(A1+32)-WEEKDAY(A1+32-DAY(A1+33))
I do not believe this formula works all the time. Unless I am wrong, it
fails for dates like 2/28/2008 through 3/1/2008, 3/29/2008 through 4/1/2008,
4/29/2008 through 5/1/2008, and so on.
Rick
You're correct, and <slap upside the face I've made that same %$#^&$ mistake
before.
Should be:
=A1-DAY(A1)+39-DAY(A1-DAY(A1)+32)-WEEKDAY(A1-DAY(A1)+39-DAY(A1-DAY(A1)+33))
--ron