View Single Post
  #1   Report Post  
Posted to microsoft.public.excel.misc
[email protected] brian.baker13@googlemail.com is offline
external usenet poster
 
Posts: 8
Default One for the chart wiz kids

Hi

I do a weekly quality chart at work for worker performance. This is a
horizontal chart with a bar for each employee with %age on the X scale
& the Operator name on the Y. I want to include two target lines
vertically on the chart for 1 & 1.75%. So far I cannot do this anfd
have to draw two lines down the chart. I have two types of worker one
about 15 of them with a 1.75% target and about 5 workers who have a 1%
target. Could anybody help please.

Thanks

Brian