Assuming data in A2 down,
Put in B2: =A2*50
Copy B2 down as far as required by dragging the fill handle (the solid
square at the bottom right corner of the cell).
--
Max
Singapore
http://savefile.com/projects/236895
xdemechanik
---
"benjamin" wrote:
I have hours in Line A, and Need the code to multiply by 50/hr and have the
results in Line B